Previous week
Agenda and Notes for 14 Oct 2008 Shape Tools meeting
prev. weeks to do
- CS - JNI interface to ShapeTools readers
- CS - Integrate triangle strip reader
- CS - locate and evaluate methods for Mipav, FreeSurfer surface extraction.
- CS - (with BC) write table translation appl. specification.
- CS - diagnose why Shantanu's analyze file is not being read by the image coordinate tools.
- RC - adapt fly wing protocols for warp tools.
- RC complete adapting warp tools for curve match.
- RC - write multigrid PDE solver library documents.
- BC - WRite table translation tool,first revision to
- BC - WRite table translation tool project definition page.
- BC - modify ShapeReporter output to enumerate selected vertices.
- BC - start work on shape density calculation tool
Discussed
Active Projects
- JNI/C ShapeTools interface
- modify WarpTools to use CurveMatch
- modify fly warp tools to use warp tools methods
- allow shape reporter's output to set vertex attribute colors
- compute the local density of a surface mesh.
To do for Next meeting?
Unscheduled
- CS - find definition of BrainVisa ribbon format, report to Ivo on feasibility of reading and using this file format
- write RDD implementation that wraps a stack of buffered images.
- CS, RC - write paper comparing steps of warp protocol with paul's protocol
- CS write BrainVisa mesh ShapeToolsIO writer.
- CS - Revise AttributeSet in shape tools core for safe concurrent access
- CS - Integrate & release ColorSurface tool
- CS - shape io gzip reader bug fix.
- CS, RC - complete handout matching current warp protocol applications with older protocol applications.
- BC - add a table edit mode to the color map control point dialog (shows control point values in editable spreadsheet).
- RC - software download descriptions MultiGridPDE libary (do after Aug 14 meeting)
- N/A - RGB to LAB color model interconversion. tool
- N/A - create C/Java ShapeIO interface (eval. Swig, JNI for this purpose)
- N/A - software download descriptions MultiGridPDE libary (do after Aug 14 meeting)
- N/A - software to convolve an image with a shape.
Current Projects Status
Key: * = schedule work, completed. 0 = schedule work, uncompleted,
[ ] - incomplete, unplanned, extra work, [X] = completed unplanned extra work.